TechnipFMC Wins Subsea Contract off Brazil

FPSO_Cidade_de_Caraguatatuba_MV27.jpg

TechnipFMC said on Tuesday it has secured a contract to supply flexible pipes for oil production, gas lift and gas injection as well as associated accessories for the Lapa field, located in the pre-salt Santos Basin, under the BM-S-9A concession, at 2,150 meters of water depth offshore Brazil.

The field will be connected to the floating production storage and offloading unit (FPSO) Cidade de Caraguatatuba, already in operation.

The deal was awarded by Total E&P do Brasil Ltda., on behalf of the Lapa Field Consortium, comprised of Total (35%), Shell Brasil Petróleo Ltda. (30%), Repsol Sinopec Brasil S.A. (25%) and Petróleo Brasileiro S.A. - Petrobras (10%), and is worth between $75 million and $250 million, TechnipFMC said.

Arnaud Piéton, President Subsea at TechnipFMC, commented: “We are honored to be selected to execute the Lapa pre-salt field project in Brazil. We look forward to collaborating with Total and the Lapa Field Consortium to further enhance the hydrocarbon potential of Brazil”.

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Liquefaction and Regasification Report And Online Database

  • Annual reports -- Our new 150-page report is the first professional effort to systematically look at the universe of FLNG and FSRU projects in the planning stage – and categorize the likelihood of each making the development investment hurdle.
  • Online database -- The online database is updated every day – with information direct from primary sources. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request Free Trial