Petrobras Makes FID to Advance Two Oil Projects Offshore Brazil

Petrobras Makes FID to Advance Two Oil Projects Offshore Brazil.jpeg

Petrobras, together with its partners, has made the final investment decision (FID) for the second development phase of Atapu and Sépia fields, located in the prolific pre-salt Santos Basin, offshore Brazil.

The Atapu field has been producing since 2020 through the P-70 floating production storage and offloading (FPSO) unit, with a production capacity of 150,000 barrels of oil per day (bopd).

The second development phase, Atapu-2, will comprise a new-built FPSO of 225,000 bopd capacity.

TotalEnergies owns an interest of 15% in the Atapu field, in partnership with Petrobras (65.7%, operator), Shell (16.7%), Petrogal (1.7%) and PPSA (0.9%).

The Sépia field has been producing since 2021 through the Carioca FPSO unit, with a production capacity of 180,000 bopd.

The second development phase, Sépia-2, will also comprise a new-built FPSO of 225,000 bopd capacity.

TotalEnergies owns an interest of 16.9% in the Sépia field, in partnership with Petrobras (55.3%, operator), Petronas (12.7%), QatarEnergy (12.7%) and Petrogal (2.4%).

The two FPSOs are expected to start producing as from 2029. They have been designed to minimize greenhouse gas emissions through an all-electric configuration and technologies such as waste heat recovery, closed flare, cargo oil tank gas recovery and variable speed drive for compressors and pumps.

Seatrium has been hired by Petrobras, acting as operator of Atapu and Sepia consortiums, for the newbuild supply of FPSO platforms P-84 and P-85 for the fields.



“The decision to launch Sépia-2 and Atapu-2 is a new milestone in our strong growth story in Brazil, a core area for the Company thanks to its world-class low-emission and low-cost oil resources.

“Following the startup of Mero-2 in late 2023 and the upcoming startups of Mero-3 in 2024 and Mero-4 in 2025, Brazil will soon account for more than 200,000 barrels of oil equivalent per day (boepd) in equity production for the Company. At their plateau Sépia-2 and Atapu-2, the tenth and eleventh FPSO for TotalEnergies in Brazil, will contribute to maintain TotalEnergies production in this key country above 200,000 boepd,” said Nicolas Terraz, President Exploration & Production of TotalEnergies.

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Liquefaction and Regasification Report And Online Database

  • Annual reports -- Our new 150-page report is the first professional effort to systematically look at the universe of FLNG and FSRU projects in the planning stage – and categorize the likelihood of each making the development investment hurdle.
  • Online database -- The online database is updated every day – with information direct from primary sources. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request Free Trial