Ertuğrul Gazi FSRU Delivered to Turkey's BOTAS

882714feac6ed8d7_org.jpg

The Ertuğrul Gazi Floating Storage and Regasification Unit (FSRU) for was recently from South Korea to Turkey's BOTAŞ Petroleum Pipeline Corporation (BOTAS), the classification society ABS has informed.

Built by Hyundai Heavy Industries in accordance with the ABS Guide for Building and Classing LNG Regasification Vessels, the 295-meter-long Ertuğrul Gazi, which has a capacity for 170,000 m3 of LNG, is now undergoing final regasification trials on site before starting operations, ABS said.

With a daily gasification capacity of 28 million cubic meters (990 million standard cubic feet) per day, the new FSRU ranks among the vessels with the highest send-out capacity in the world. Classed as a ship it is designed with the capability to trade internationally as required, ABS added.

"As the world’s leading provider of classification services in the LNG sector we are proud to support this important project for Turkey,” said Vassilios Kroustallis, ABS Vice President, Europe Business Development.  

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Liquefaction and Regasification Report And Online Database

  • Annual reports -- Our new 150-page report is the first professional effort to systematically look at the universe of FLNG and FSRU projects in the planning stage – and categorize the likelihood of each making the development investment hurdle.
  • Online database -- The online database is updated every day – with information direct from primary sources. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request Free Trial