Bluewater Taps Royston for FPSO Engine Overhaul

Aoka Mizu.jpg

FPSO operator Bluewater Services signed a framework agreement with marine engineering and maintenance firm Royston for engine overhaul, repair, and associated services on two of its FPSOs.

Under the agreement, Royston will carry out planned engine maintenance and emergency repairs on the Haewene Brim and Aoka Mizu FPSOs operating in the North Sea. The framework includes main engine work on both vessels as well as on generator sets and fire pumps.

The Samsung built 103,000 DWT, Hæwene Brim, operational at Pierce field in the UK sector of the North Sea for Shell, is powered by four Wartsila W46 medium speed engines.

The Aoka Mizu is on contract with Hurricane Energy plc for production work on the Lancaster field, west of Shetland, and utilizes MAN 32/40 diesel generating systems. Haewene Brim FPSO - Credit: Royston

Royston has in recent years carried out extensive and regular main engine services on the Haewene Brim and has also previously completed the refurbishment and refit of essential power systems on the Aoka Mizu.

Cameron Lawson, Marine and Offshore Sales Manager for Royston, said: “FPSO systems are designed for maximum productivity and operating uptimes, so it is vital that engine maintenance work is carried out efficiently and effectively, to the highest technical standards.

“Our relationship with Bluewater means that we are very familiar with both vessels and we are delighted that the new arrangement will formalise and further extend our support to them in this way.”

While their FPSOs are in operation, Bluewater is responsible for the overall provision of engineering support on the vessels. Having a formal agreement in place with independent diesel engines specialist Royston for engine service and repair work forms part of an approach that helps to effectively manage some of the risks associated with FPSO operations.


Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Liquefaction and Regasification Report And Online Database

  • Annual reports -- Our new 150-page report is the first professional effort to systematically look at the universe of FLNG and FSRU projects in the planning stage – and categorize the likelihood of each making the development investment hurdle.
  • Online database -- The online database is updated every day – with information direct from primary sources. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request Free Trial