Agogo FPSO to Reach Azule Energy’s Field off Angola in Mid-May (Photos)

One of the world’s most advanced offshore production assets, the Agogo floating production storage and offloading (FPSO) vessel, operated by Yinson Production for Azule Energy, made a scheduled technical stop at Walvis Bay in Namibia, while en route to a field offshore Angola.

The brief stopover, which took place on May 8, 2025, was part of planned logistics to replenish stores and facilitate crew changes.

Built and operated by Yinson Production for Azule Energy, the vessel is expected to reach Angola in mid-May.

The Agogo FPSO is expected to operate in the second half of 2025 in the Agogo Integrated West Hub Development Project in Block 15/06 offshore Angola for Azule Energy under a 15-year firm charter with the option to extend for another five years, and a total contract value of up to approximately $5.3 billion.

With a production capacity of 120,000 barrels of oil per day, the vessel features cutting-edge carbon-reduction technology, including the industry’s first pilot post-combustion carbon capture system on an FPSO.

It also includes closed flare system, hydrocarbon blanketing, combined cycle technology, automated process controls, and all-electric drives.

The carbon-reducing technologies onboard the FPSO are expected to reduce carbon emissions by up to 27%, according to Yinson Production.

“We’re proud to have the Agogo FPSO pass through Walvis Bay, a vital hub on Africa’s west coast. The successful transit of Agogo is a testament to our teams’ coordination and commitment, and it reflects the international scale and technical complexity of modern energy projects in the region. The vessel’s presence in Walvis Bay reflects the growing role of African ports in enabling large-scale energy infrastructure projects,” said Per Dyberg, Project Director of Yinson Production.

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Liquefaction and Regasification Report And Online Database

  • Annual reports -- Our new 150-page report is the first professional effort to systematically look at the universe of FLNG and FSRU projects in the planning stage – and categorize the likelihood of each making the development investment hurdle.
  • Online database -- The online database is updated every day – with information direct from primary sources. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request Free Trial